KIT Homes

Fisher, Kilchoan, Lochaber

Client Name: Fisher Location: Kilchoan Year of Build: 2023 Main Contractor: Munro Builders Ltd Total Floor Area: 95m2 Total Build Cost (Excluding VAT and Land): £225,000 Cost per M2: £2,368 Completed in 2023, the client embarked on a self-build journey in Kilchoan; choosing a Norscot design as the foundation for their dream home. Already owning

Fisher, Kilchoan, Lochaber Read More »

Mrs Miller & Mr Bamfield, Upper Humster, Caithness

Client: Mrs Miller & Mr Bamfield Site: Upper Humster, Caithness Year(s): 2018 Main Contractor: Green and Cameron Ltd Design: Jonathan Miller – NorCAD Design Total Floor Area: 231m2 Total Build Costs (excluding land & VAT): £300,000.00 (Approx.) Cost per m2: £1,298.00 Mrs Miller and her husband Mr Bamfield married in 2006 each owning their own separate homes.  Their future plan was to live

Mrs Miller & Mr Bamfield, Upper Humster, Caithness Read More »

Mr A Gunn, Newton of Swiney, Lybster, Caithness

Client: Mr A Gunn Site: Newton of Swiney, Lybster Years(s): 2014-2018 Main Contractor: Variety of local tradesmen Total Floor Area: 169m2 (Approx.) Total Build Cost (excluding land & VAT): £210,000 (Approx.) Cost per m2: £1,147.54 (Approx.) Mr Gunn spent his childhood growing up in the town of Lybster. Although he lived away in Aberdeen for some years, Lybster was always his home,

Mr A Gunn, Newton of Swiney, Lybster, Caithness Read More »

Mr & Mrs Hess, Heathcliff, Brough, Caithness

Client: Mr & Mrs Hess Site: Heathcliff, Brough, Caithness Year(s): 2017/2018 Main Contractor: Green and Cameron Ltd Total Floor Area: 98m2 Total Build Costs (excluding land & VAT): £124,852.00 Cost per m2: £1,274.00 Retired Philadelphian police captain, Fred Hess and his wife first visited Caithness  back in 1989 and fell in love with the beautiful, picturesque countryside the county has to offer.

Mr & Mrs Hess, Heathcliff, Brough, Caithness Read More »

Mr & Mrs Bowers

Client: Mr & Mrs Bowers Site: Inver, Tain Year(s): 2018 / 2020 Main Contractor: Full Self Build Mr & Mrs Bowers had always wanted to build their own home. They searched for the perfect idyllic spot for some time before settling on Inver. “It was so peaceful, calm, and quiet, such a beautiful place to build a home and

Mr & Mrs Bowers Read More »

Armadale Hall

Name- Armadale Village Hall Site/location- Armadale, Near Thurso Year of build- 2020 Architect/Designer – Macdonald Associates Main contractor- Norbloc Total floor area- 197 M2 Total build cost (excluding vat and land) – £405,000 Cost per M2- £2055 The Armadale Committee’s original plan was to refurbish the existing village hall, which was looking a ‘bit sorry for itself after a lack of maintenance.’  However,

Armadale Hall Read More »

Mr MacLeod, Bruernish, Isle of Barra

Year of build: 2015 Main contractor:  Jim Magee Total floor area: 160m2 Total build cost (excluding vat and land): £135,000 Cost per M2: £844.00 Project Background: I live on a remote Scottish island with very few housing to buy so I decided that I would build a house for my family on my croft land especially since the Scottish government

Mr MacLeod, Bruernish, Isle of Barra Read More »